1000rpm Bottom Discharge Centrifuge 230kg Sedimentation Basket Centrifuge
Product Details:
Place of Origin: | CHINA, JIANGSU |
Brand Name: | HUADA |
Certification: | GB/T19001-2016/ISO9001:2015 01418P10003R2M |
Model Number: | PGZ1000 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | To be negotiated |
Packaging Details: | Standard with wooden pallet and poly film wrapping |
Delivery Time: | 60 work days |
Payment Terms: | T/T, L/C, , Western Union |
Supply Ability: | 100 sets per month |
Detail Information |
|||
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | Centrifugal Type: | Basket Centrifuge |
---|---|---|---|
Discharge: | Scraper Bottom Discharge | Effective Basket Height(mm): | 550 |
Machine Control: | PLC Control | Screen Touch: | Optional |
Motor Start Control: | Frequency Control | Max. Speed(r/min): | 1100/1200 |
Highlight: | 1000rpm Bottom Discharge Centrifuge,1000rpm basket centrifuge,Bottom Discharge Centrifuge 230kg |
Product Description
PGZ 1000r/min Speed High Centrifugal Forces Type Platform Base Fiber Separation PLC Control Sedimentation Basket Centrifuge
Working Principle
The bottom discharge scraper centrifuge is the automatic vertical filtering centrifuge. The motor drives the basket to rotate at a high speed through the belt, and the materials to be separated enter into the centrifuge basket at a high speed through the feeding system under the control of the pre-programmed program.
Under the action of the centrifugal field, the material will be filtered through the filter media (filter cloth/screen), the liquid phase will be discharged through the liquid outlet, and the solid phase will be retained in the basket. The material detection device will detect the filling level of the material in real time. When the basket cake reaches the loading capacity specified by the machine, it stops feeding.
The filter cake is then washed and dried. After the cake meets the dehydration requirements, the centrifuge reduces to the scraping speed, and the scraper removes the cake under the hydraulic (pneumatic) drive, and then the cake is discharged through the solid discharge port of the centrifuge at the lower part.
Technical Parameters
Items | Models | |
PGZ1000 | ||
Basket Diameter(mm) | 1000 | |
Effective Basket Height(mm) | 550 | |
Basket Volume(L) | 190 | |
Max. Capacity(kg) | 230 | |
Motor Power(kw) | 15 | |
Max. Speed(r/min) | 1100/1200 | |
Max. Separation Factor | 678/805 | |
Weight(kg) | Platform construction | 3500 |
Square box structure | 4000 |

PROCEDURE CONTROL
Huada has a professional quality management team, which implements each link related to users and products from contract review, technical design, material procurement, manufacturing process to after-sales service according to standard operating procedure, to effectively control the full process from design, purchasing, manufacturing to service.
Quality certification and mechanical safety certification
We established quality management system; in 1996, our products passed ISO quality management system certification and from 1998 our products passed mechanical safety certification and reexamination is made each year. Effective quality management system can ensure the product quality,
Contract review
For individual requirements of customers, we make security risk evaluation specific to contract and technical agreement, to ensure that safety requirements. We confirm individual configuration and changes and propose quality plan and opinions.
Process control
Quality plan: For each order, at the time of design output, we put forward the quality plan of the production batch according to the customers’ individual requirements and internal quality control requirements and make clear information like material, configuration, individual changes, inspection requirements and special agreement. The quality plan is the internal control document for purchase, manufacture, inspection and confirmation for this batch.
ERP process: Through process and permissions settings, we standardize the product realization process including design output, change, procurement, materials distribution, machining process, inspection and records, warehouse-in and warehouse-out.
For every process, whether purchasing, internal parts processing or assembly process, we have established strict quality control requirements. For welding, surface coating, main and key parts processing and general assembly, we have formulated detailed operation and inspection regulations to ensure effective control of each process.
Inspection and validation
A full-time inspector is assigned to every workshop/production line, who is responsible for process tracking and inspection. One centrifuge can have more than 300 control points for inspection and validation set, to ensure that each centrifuge conforms to standard requirements, design requirements and customers’ individual requirements.
ERP system carries on summary and mathematical analysis of inspection data, puts forward improvement scheme and makes continual improvement.
