3 Phase Automatic Horizontal Centrifuge For Olive Oil Production
Product Details:
Place of Origin: | CHINA, JIANGSU |
Brand Name: | HUADA |
Certification: | GB/T19001-2016/ISO9001:2015 |
Model Number: | LWS |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD40000-150000/set |
Packaging Details: | Standard with wooden pallet and poly film wrapping |
Delivery Time: | 50 work days |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 100 sets per month |
Detail Information |
|||
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | Centrifugal Type: | Decanter Centrifuge |
---|---|---|---|
Discharge: | Scroll Discharge | Machine Control: | PLC Control |
MOC: | Stainless Steel | Certificate: | ISO9001 |
Operate: | Automatic Continuous Operation | Explosion-proof System: | Optional |
High Light: | 3 Phase horizontal centrifuge,ISO olive oil centrifuge,horizontal centrifuge Olive Oil |
Product Description
LWS 3-Phase Automatic Continuous Operation Customized Decanter Centrifuges Used For Olive Oil Production
Operation Principle
Drum and screw rotate at a certain different speed. The feed enters the drum through a stationary inlet tube and is accelerated smoothly by an inlet rotor. The resulting centrifugal forces make the solids collect on the wall of the drum. Screw conveyor continual moving the solid to conical end of drum, discharge through discharge port after dried in the dry area, however, light liquid forms the inner layer and effusion through overflow port of drum, then discharge through liquid outlet port.
Technical Parameters
Model | Bowl Diameter (mm) | L/D | Bowl Speed (r/min) | Separation Factor | Power of Driving Motor (kW) | Weight (kg) | Dimension (L×W×H) (mm) |
LWS355*1460 | 350 | 4.17 | 4000 | 3130 | 22-30 | 2200 | 3450*1010*1030 |
LWS420*1680 | 420 | 4 | 3600 | 3050 | 30-37 | 4000 | 3500*1450*1300 |
LWS530*2120 | 530 | 4 | 3200 | 3040 | 45-55 | 5500 | 4100*1600*1450 |
LWS720*2880 | 720 | 4 | 2000 | 1610 | 110 | 11000 | 5300*2050*1750 |
PROCEDURE CONTROL
Huada has a professional quality management team, which implements each link related to users and products from contract review, technical design, material procurement, manufacturing process to after-sales service according to standard operating procedure, to effectively control the full process from design, purchasing, manufacturing to service.
Quality certification and mechanical safety certification
We established quality management system; in 1996, our products passed ISO quality management system certification and from 1998 our products passed mechanical safety certification and reexamination is made each year. Effective quality management system can ensure the product quality,
Contract review
For individual requirements of customers, we make security risk evaluation specific to contract and technical agreement, to ensure that safety requirements. We confirm individual configuration and changes and propose quality plan and opinions.
Process control
Quality plan: For each order, at the time of design output, we put forward the quality plan of the production batch according to the customers’ individual requirements and internal quality control requirements and make clear information like material, configuration, individual changes, inspection requirements and special agreement. The quality plan is the internal control document for purchase, manufacture, inspection and confirmation for this batch.
ERP process: Through process and permissions settings, we standardize the product realization process including design output, change, procurement, materials distribution, machining process, inspection and records, warehouse-in and warehouse-out.
For every process, whether purchasing, internal parts processing or assembly process, we have established strict quality control requirements. For welding, surface coating, main and key parts processing and general assembly, we have formulated detailed operation and inspection regulations to ensure effective control of each process.
Inspection and validation
A full-time inspector is assigned to every workshop/production line, who is responsible for process tracking and inspection. One centrifuge can have more than 300 control points for inspection and validation set, to ensure that each centrifuge conforms to standard requirements, design requirements and customers’ individual requirements.
ERP system carries on summary and mathematical analysis of inspection data, puts forward improvement scheme and makes continual improvement.