LGZ Vertical Automatic Bach Operate Filtering Centrifuge for APIs Pharmaceutical Centrifuge Machine
Product Details:
Place of Origin: | CHINA, JIANGSU |
Brand Name: | HUADA |
Certification: | GB/T19001-2016/ISO9001:2015 01418P10003R2M |
Model Number: | LGZ |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | To be negotiated |
Packaging Details: | Standard with wooden pallet and poly film wrapping |
Delivery Time: | 80 work days |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 100 sets per month |
Detail Information |
|||
Features: | Automatic Working, Saving Labor | MOC: | Stainless Steel |
---|---|---|---|
Core Components: | PLC, Bearing, Motor | Machine Control: | PLC Control |
Operation Type: | Automatic Batch Centrifuge | Discharge Type: | Scraper Bottom Discharge |
Key Selling Points: | Convenient | Rotating Speed Control: | Frequency Converter |
High Light: | pharmaceutical centrifuge machine 1150rpm,1150rpm pharmaceutical centrifuge,GB pharmaceutical centrifuge machine |
Product Description
LGZ Frequency Converter Rotating Speed Control Automatic Pharmaceutical Machinery/Pharmacutical Centrifuges
Product Description
Frequency control by the main motor, a smooth start, through the narrow V belt antistatic flame retardant will force transmission to the bowl, so that high-speed rotating around its own axis, forming a centrifugal force field, the material from the upper part of the feeding tube into the bag with the basket from the will power to force material trapped in the bag, the shutdown, open the case and cover, hanging out outside the machine to discharge discharge locations; with washing pipe materials can be washed.
Main feature
Start with frequency converter for stepless speed regulation, the time of rotating can be set and controled with a PLC (programmable logic controller) to start the steady expansion of the scope that can be used, with the main control cabinet and field proof auxiliary control panel can operate both to improve safety sex, no basis for the installation, eliminating the conventional hanging machine feet, simplify the installation process. No base plate weight and the selection of isolating types of damping system that allows devices to be completely absorbing vibrations generated by change. On the basis of the ground and the surrounding non-interference.
Shell structure for the flip, can be laminated on the centrifuge drum shell with space for thorough cleansing.
Structural design is reasonable, more comprehensive cleaning and sterilization. Particularly difficult to adapt materials for the staff contact for high cleanliness, washing demanding proof high grade solid-liquid separation. Lifting bag discharge, can be off-site discharge, improve efficiency, reduce labor intensity, environmental conditions fully comply with GMP standards.
Applies to both solid phase for the granular filtering, it can be used for dewatering fibrous material, particularly high viscosity, fine particle size, toxic and hazardous, flammable materials in the filter.
For example: gypsum, thiamine, Glauber's salt, copper sulfate, nickel sulfate, a chloride, acetic acid, borax, soda, rubber additives, dye, plastic raw materials, fertilizer, oil, all kinds of resin, salt, MSG, food additives, starch sugar, vitamins, antibiotics and other drugs, herbicides, insect repellents, copper, zinc, aluminum ore dehydration, metal refining, volleyball acid plaster, water treatment.
Technical Parameters
Items | Models | ||||||
LGZ800 | LGZ1000 | LGZ1250 | LGZ1400 | LGZ1600 | LGZ1800 | ||
Basket Diameter(mm) | 800 | 1000 | 1250 | 1400 | 1600 | 1800 | |
Effective Basket Height(mm) | 420 | 550 | 630/800 | 750 | 800/1000 | 1000 | |
Basket Volume(L) | 100 | 190 | 400/500 | 600 | 800/1000 | 1250 | |
Max. Capacity(kg) | 135 | 230 | 500/600 | 700 | 1000/1250 | 1500 | |
Motor Power(kw) | 7.5/11 | 15 | 22/30 | 30/37 | 37/45 | 55 | |
Max. Speed(r/min) | 1200/1500 | 1100/1200 | 1000/1200 | 950/1150 | 850 | 800 | |
Max. Separation Factor | 645/1007 | 678/805 | 700/1007 | 700/1036 | 647 | 645 | |
Weight(kg) | Platform construction | 2000 | 3500 | 5000 | 9000 | 12000 | 17000 |
Square box structure | 4000 | 6000 | 13000 |
PROCEDURE CONTROL
Huada has a professional quality management team, which implements each link related to users and products from contract review, technical design, material procurement, manufacturing process to after-sales service according to standard operating procedure, to effectively control the full process from design, purchasing, manufacturing to service.
Quality certification and mechanical safety certification
We established quality management system; in 1996, our products passed ISO quality management system certification and from 1998 our products passed mechanical safety certification and reexamination is made each year. Effective quality management system can ensure the product quality,
Contract review
For individual requirements of customers, we make security risk evaluation specific to contract and technical agreement, to ensure that safety requirements. We confirm individual configuration and changes and propose quality plan and opinions.
Process control
Quality plan: For each order, at the time of design output, we put forward the quality plan of the production batch according to the customers’ individual requirements and internal quality control requirements and make clear information like material, configuration, individual changes, inspection requirements and special agreement. The quality plan is the internal control document for purchase, manufacture, inspection and confirmation for this batch.
ERP process: Through process and permissions settings, we standardize the product realization process including design output, change, procurement, materials distribution, machining process, inspection and records, warehouse-in and warehouse-out.
For every process, whether purchasing, internal parts processing or assembly process, we have established strict quality control requirements. For welding, surface coating, main and key parts processing and general assembly, we have formulated detailed operation and inspection regulations to ensure effective control of each process.
Inspection and validation
A full-time inspector is assigned to every workshop/production line, who is responsible for process tracking and inspection. One centrifuge can have more than 300 control points for inspection and validation set, to ensure that each centrifuge conforms to standard requirements, design requirements and customers’ individual requirements.
ERP system carries on summary and mathematical analysis of inspection data, puts forward improvement scheme and makes continual improvement.